OpenBCM V1.08-5-g2f4a (Linux)

Packet Radio Mailbox

IZ3LSV

[San Dona' di P. JN]

 Login: GUEST





  
G8MNY  > TECH     27.02.09 10:15l 29 Lines 952 Bytes #999 (0) @ WW
BID : 19185_GB7CIP
Read: GUEST
Subj: HITACHI V-1050 SCOPE info?
Path: IZ3LSV<IK2XDE<DB0RES<ON0AR<GB7CIP
Sent: 090227/0151Z @:GB7CIP.#32.GBR.EU #:19185 [Caterham] $:19185_GB7CIP
From: G8MNY@GB7CIP.#32.GBR.EU
To  : TECH@WW

Hi & thanks for reading,
      I bid for this faulty 100MHz dual beam scope at a club junk sale & won it
for only œ1.50. It had no handbook so I had to fault the "no display" problem
blind. I found a short circuit 22V zener in the complex brillance circuit, & I
also replace the EHT shroud that was missing, obviosuly someone had been there
& gave up on it.

ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿
³³~~~~~~~³o  o      ,ø ³
³³       ³ù  :  (O)  o ³
³³       ³o (o)  o   o ³ 
³³_______³o      ú  .' ³
³ú (o)  o   (o)  ú  :  ³
³o    o ù'ùo      o o o³
ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÙ

Well it now works quite well, but I think there is another fault in the dual
timebase mode control, as there seems to be no difference between A timbase &
A intensified with B timebase, there is a very slight difference one brilliance
that is it.

Any information on this old piece of testgear would be very welcome.


73 de John G8MNY @ GB7CIP


Read previous mail | Read next mail


 08.09.2024 03:19:10lGo back Go up